| Official opening | October 1997 |
|---|---|
| Total floors | 18 Stories + 1 basement |
| Construction |
Reinforced concrete core wall and floors with pre-stressed beams. Tempered glass curtain wall + safety film at ground and mezzanine floor. Granite cladding on ground and mezzanine floor pillars and beams. |
| Power Supply | 3030 kVA main electricity supply 2,447 kVA building electrical load assumption |
| Back-up Power | 100 % back-up capacity |
| Air Conditioning | Central water cooling system 24 hours chilled water available for server room |
| Lighting | 500 lux illumination on typical floors |
| Telecommunication | Vertical shaft for fiber optic and standard cable |
| Lift |
8 Passenger Lifts Low Zone: GF, 3F – 11/F High Zone: GF, 11/F – 18/F 1 Service Lift, Basement – 18/F |
| Fire & Safety | Heat and smoke detector alarms, automatic fire alarm, fire hydrant and fire extinguishers, sprinkler system, exit signs, public address system, 2 fire stairs with double handrails, emergency lighting and pressurized fresh air. |
| Executive Toilet | Available per floor, 3/F – 18/F, with shower cubical and hot water |
| Public Toilet | Available per floor, GF – 18/F except 2/F (mezzanine floor) |
| Pantry & Ablution | Available per floor, 2/F (mezzanine floor) – 18/F |
| Car Parking | Available in car park building 1, 7 floors, approximately 700 lots and Plaza Senayan’s car park building |
| Sentral Senayan I | |||
| Developer & Manager | PT Senayan Trikarya Sempana | ||
| Main Contractor | PT Kajima Indonesia | ||
| Design architects & Engineers | Kajima Design, Japan Kajima Design Asia, Singapore |
||
| Project Architects | PT Airmas Asri | ||
| Structural Engineers | PT Wiratman & Associates | ||
| M/E Engineers | PT Arnan Pratama Consultant | ||